June 09, 2004
» Another attempt on the Oak Island Money Pit
Mr. Wonnacott said a pipe header system would be installed in the holes and chilled brine would be pumped in, creating a ring of frozen soil down about 60 metres to bedrock.
"We want to be sure that whatever is in the money pit is inside that frozen ring, and we think we've got the correct location for the shaft to do it."
